Week 39

Curbing being installed in parking lot and around the building. Stucco still being applied to our building weather not cooperating. Wood flooring being put down on the altar area. Lighting and drop ceiling grid work being installed through out the building. All the windows and door frames are installed.  Still waiting for okay from the county to start the new driveway.